Menu Close

How long did it take to build the Clyde Tunnel?

How long did it take to build the Clyde Tunnel?

seven years
It took seven years to complete, cost £10m to build and claimed the lives of two men in the construction process. In an era before mass car ownership, the Clyde Tunnel in Glasgow was designed to handle around 9,000 vehicles a day when it was opened by the Queen in 1963.

Do you have to pay to go through the Clyde Tunnel?

The Clyde Tunnel this year celebrates 55 years since its opening. To see the transformed tunnel, please watch the video in the player above. Tickets to walk through the tunnel, which are free of charge, are available for the general public HERE.

Is the Clyde Tunnel cycle path open?

Clyde Tunnel – Pedestrian and Cycle route The northbound cycle/pedestrian tunnel remains open for travel in both directions.

Can you cycle through the Clyde Tunnel?

During the Covid19 pandemic, the Clyde Tunnel pedestrian and cycleway has remained open to the public 24/7. Within the tunnels, pedestrians and cyclists are separated by a handrail with one way direction for cyclists in both tunnels. Cyclists must comply with the 5mph maximum speed limit signs.

How many people died building the Clyde Tunnel?

Two men died
Two men died during its construction due to the effects of working in a compressed air environment. “The total cost of the project was £10 million.

What height is the Clyde Tunnel?

17 ft 6 in
The Clyde Tunnel is a crossing beneath the River Clyde in Glasgow, Scotland. Two parallel tunnel tubes connect the districts of Whiteinch to the north and Govan to the south in the west of the city….Clyde Tunnel.

Overview
Tunnel clearance 17 ft 6 in (5.3 m)

Is the River Clyde man made?

The river has been artificially straightened and widened where it passes through the city centre. Although the new Clyde Arc now hinders access to the historic Broomielaw dockland area, seagoing ships can still come upriver by following the dredged channel as far as Finnieston, where the PS Waverley docks.

Is the Innocent Railway still closed?

Route 1: Innocent Tunnel and Railway Path, Edinburgh: complete path closure due to risk of rockfall. We have been made aware by members of the public and partners that the Innocent Tunnel and railway path along Route 1 (location) are currently closed due to the risk of rockfalls.

Can you cycle the water of Leith?

This waterside cycling and walking trail follows the Water of Leith through Edinburgh. The route runs for just over 12 miles from Balerno to Leith along the small river. It’s a nice flat path, ideal for cyclists looking for an easy ride, or walkers after an easy waterside stroll.

What area is Clydebank?

8.74 km²
Clydebank/Area

Can I swim in the Clyde?

One of the ‘attractions’ of open water swimming is cold water and the water temperature of the Clyde varies between 6° C in February to 15° C in September. And some of our local swimmers participate all year-round. So if you are in the area and are already a keen swimmer, get in touch!

How clean is the River Clyde?

Water quality has gone from “bad” to “moderate” – and “excellent” in places. About 100km (62 miles) of waterways has also been opened up to migratory fish. Sepa, which monitors the water quality of Scotland’s lochs and rivers, reported that the River Clyde was in “significantly better health than expected”.

What was the purpose of the Clyde Tunnel?

The Clyde Tunnel was the first modern road crossing of the River Clyde. First recommended in reports published in the 1940s, it was planned as a way or relieving traffic on the congested bridges of the city centre. The tunnel and its approaches were built in stages throughout the 1950s & 60s.

When was the Clyde Tunnel in Glasgow built?

The tunnel and its approaches were built in stages throughout the 1950s & 60s. They comprise grade separated dual carriageways and at-grade four lane single carriageways.

When did the west tunnel start and end?

The West tunnel (Northbound) was completed first and opened on the 3rd of July 1963 by The Queen. Initially this meant that the Clyde Tunnel was a single carriageway route with traffic going in both directions, north and southbound through the West Tunnel.

How big is the Clyde Tunnel in feet?

The tunnels are each 762 metres (2,500 feet) long with a gradient approaching 6% or 1:16. The width of the river at this point is 123 metres (404 ft).