Water bound macadam road is a road in which the wearing course consists of clean crushed aggregates which are mechanically interlocked by rolling. These aggregates bound together with filler material and water laid on a well-compacted base course.

What is mean by water bound macadam?

The road whose wearing course consists of clean crushed aggregates, mechanically interlocked by rolling and bound together with filler material and water laid on a well compacted base course, is called water bound macadam (W.B.M) road.

What is difference between WBM and WMM?

Materials used in the WBM are the stone aggregates, screenings and binder material(Stone dust with water) while in WMM material used are only stone aggregates and binders. Quantity of the WBM is generally measured in cubic meters while that of the WMM in square meters.

What is mean by WBM?

WBM road means water bound macadam road.

What is WMM layer?

Wet Mix Macadam laying method contains of laying spreading and compacting of clean, crushed, well-graded granular materials on a prepared and Granular sub-Base. Wet Mixed Macadam (WMM) Base thickness of single compacted should not be less than 75 mm. WMM shall be laid in layers of 75mm or 100mm as per thickness.

What is DBM in civil engineering?

Dense Bituminous Macadam (DBM) is a binder course used for roads with more number of heavy commercial vehicles and a close-graded premix material having a voids content of 5-10 per cent.

What are the materials generally used for water bound macadam?

The coarse aggregates used in W.B.M generally consists of hard varieties of crushed aggregates or broken stones. However, soft aggregates like over burnt bricks metal, kankar and laterite may be used.

What is meant by WMM?

WBM(Water Bound Macadam) conventional method and WMM(Wet Mix Macadam) modern technology- are base course layers for Pavement/Road design. In case of WBM stone aggregates and binders are overlaid on one another at the time of construction.

What is the purpose of WMM?

wet mix macadam (wmm) in Road Construction. Wet Mix Macadam laying method contains of laying spreading and compacting of clean, crushed, well-graded granular materials on a prepared and Granular sub-Base. For Wet Mix Macadam material is well mixed with water and then rolled to a dense mass.

Should Wmm be on or off?

WMM. WMM (Wi-Fi multimedia) prioritizes network traffic to improve the performance of a variety of network applications, such as video and voice. All routers that support Wi-Fi 4 (802.11n) or later should have WMM enabled by default. Disabling WMM can affect the performance and reliability of devices on the network.

What is difference between BM and DBM?

It is better to use impervious DBM to ensure better performance rather than the BM. DBM will also have more structural strength compared to open graded BM (in foreign countries the structural strength of BM type open graded mix is considered about half of DBM type dense mix).

What is GSB layer?

Granular Sub Base(GSB) is natural or designed construction material, used for road construction as a sub-base layer. Granular Sub Base is a layer in road foundation just above the compacted sub-grade layer. Secondly, it works like a drainage layer where water can pass without damaging other road layers.